1.5KVA Hybrid Inverter + 1 X 12V 200AH Battery grid-tie Complete Installation

510,000

The main objective design of our off-grid energy system is to meet the desired electric load of the commercial & residential loads with high renewable fraction, low emissions and low cost of energy. The goal is to manage the energy consumption of the building, reduce the associated cost and to switch from grid-tied fossil fuel power system to an off-grid renewable and cleaner power system. Solar setup is a boon for both low electrified rural areas & also for a high consumer base in the urban cities.
Solar Batteries 12V/200AH x 1pcs
Inverter 1.5kva X 1 pcs
Mounting Structure For 1KW System
DC Junction Box 1 pcs
Wires & Cables Standard Pack
Protection Devices As Required
Lighting Protection 1 pcs

2Kva 24V pure sine wave transformer Base Hybrid Inverter with an inbuilt 40A MPPT solar charge controller to maximize and regulate DC power from the solar array for charging the battery bank. The transformer-based design provides reliable power conversion in a compact size. Besides, it’s worry-free to start up motor-type loads such as refrigerators, motors, pumps, compressors, and laser printers as well as electronic loads like TVs, Computers, power tools, and battery chargers.

 

 

 

FAQ’s

Question 1. Is Installation provided with the system?

Ans: Yes Installation of complete setup is a provided for this product.

Question 2. What is the warranty on the product?

Ans: 2 Years on panels, 1 Year on the inverter, 1 Year on batteries, 2 Years on mounting structure & 2 Years on accessories.

Question 3. Are Post-installation services that are provided?

Ans: AMC can be availed, & paid service, repair & replacement could be facilitated.

Question 4. What optimum load should I run with this setup for 5Hrs backup?

Ans: 450W Constant running load for 10Hrs-12Hrs a day could be used for 5 Hrs backup Via Solar Power.

Question 5. Why a charge controller not in the combo?

Ans: The combo comes with a charge controller of 60A.

Question 6. Can I Use a MPPT charge controller?

Ans: Yes, you use the MPPT charge controller.

Question 7. How much electricity savings could it facilitate with this system monthly?

Ans: On average it saves 120 Kwh monthly, cutting common appliance’s load consumption.

Question 8. Can I run heavy inductive or capacitive load like AC with it?

Ans:  It is recommended not to run such heavy load with small systems, all basic appliances like LED, Tube lights & fans are most suited.

Question 9. How much time would it take after booking for a complete installation?

Ans: It primarily depends upon the location of installation & complexity of the design, rest it should take a maximum of 3 days tentatively.

Question 10. Can I purchase only the components & get it installed locally.

Ans: Of course you can, on that case Installation cost will be removed from the price.

Question 11. Any additional charge that I will have to pay?

Ans: There is no additional charge as such you just need to pay the freight as actual.